Handle gaps in synthetic grid telemetry

System designHardConcept

Original practice scenario: A power-network simulator streams measurements from many devices. Some links disconnect and later replay buffered readings. Design the monitoring ingestion path.

Written for independent practice using company context; this is not a verified question from a company interview.

A REASONED APPROACH

Model answer.

Distinguish transport availability from the physical condition being measured. A missing measurement is an unknown state, not a safe zero or evidence that equipment stopped.

Work through it

  1. Identify device sessions and sequence numbers, deduplicate replay and preserve event and ingestion timestamps with quality indicators.
  2. Compute provisional windows with freshness thresholds and late-event correction rules; separate connectivity alerts from measured-condition alerts.
  3. Test burst replay, clock errors, long gaps and invalid units while bounding queues and prioritizing critical synthetic signals under overload.

Tradeoffs to discuss

  • Longer lateness windows improve historical completeness but delay stable aggregates; real-time views need visible provisional status.

Common pitfalls

  • Do not interpolate through every gap without a validated assumption.
  • Keep this monitoring design separate from real grid control or protection logic.